    Planning & Scheduling

     

    Prepare detail activity-wise Master schedule.

    Co-relate successful contractors’ schedules with the Master schedule

    Determining what resources (people, equipment, material) and what quantities of each should be used.

    Preparing Resource Schedule and Resource levelling to match the time schedule and resource availability.

    Preparing Material Requirement Schedule

    Preparing Cash flow

    Preparing Drawing & Major Materials Requirement Schedule

    Design formats and process for monitoring and reporting of progress of work.

    OUR KEY PROJECTS

     
    BASF, JNPT Client : BASF GermanType : Chemical Unit Location : JNPT, MumbaiSpace : 1.30 Lakhs Sq.ft Scope : Design & Build, Civil, PEB, MEP,Infrastructure,
    Electrical ,Fire Fighting
    Value : 18 Cr
    BASF, JNPT Client : BASF GermanType : Chemical Unit Location : JNPT, MumbaiSpace : 1.30 Lakhs Sq.ft Scope : Design & Build, Civil, PEB, MEP,Infrastructure,
    Electrical ,Fire Fighting
    Value : 18 Cr